Located along Sheikh Zayed Road in Dubai, the PPM Conrad Hotel features a 19-story, five-star hotel.  With a total of 180,000 m2, the structure is a mixed-use development consisting of a 49-story office tower, 250 m tall, on top of a 6-story podium containing hotel support services and office lobby.  The soaring tower includes a 559-key five-star hotel above a 40,000 m2 Grade A office tower and a 5,000 m2 outdoor leisure deck and pool area. There are 3 basement parking levels and a separate 13-level automated car parking facility providing a total project capacity for parking of 1,100 cars.

iMCC GREEN conducted a Pre-Evaluation Report to identify compliance with USGBC LEED certification.  The report results indicate that the building, without any changes, will meet LEED GOLD standards.

Should the client determine to proceed with LEED certification, this project would be the first LEED Gold hotel and office complex in Dubai.